Friday, May 24, 2013

A Bathroom!


Your standard pink bathroom and need of TLC.

Old fiberglass tub and tub surround.

Taking out the tub.



Tub is removed.


Corner where wall and subfloor meet damaged by water from bathtub/shower.


Old tub mixer.


Removing water rotted subfloor.

Additional framing at tub drain floor area before install of new 3/4 ply subfloor.


On another wall.  Creating a bay for eventual addition of built in shelves above ca mode.

Back to tub area. New hot and cold water shutoffs added before install of new mixer. Tile board has been installed in prep for install of new tub.

New tub.

Rough in plumbing.

Tub surround receives tile board.

Tile board joints taped and mortared.

Beginning of tile install.




As tub surround progressed it became necessary to take up remaining subfloor.



Addition of blocking to floor joist system.


Fresh, solid start.  Bolstered floor joist system ready for 3/4 pressure treated ply subfloor.

Subfloor in.

Addition of tile board over subfloor in prep for tile.

Tile continues to progress in tub surround.




Playing with floor tile lay out.



After floor tile progress, new narrower profile vanity/sink installed.







Finished project photos to be added soon!

Saturday, February 9, 2013

A Nice Porch

On the scene.  The client contracted DammanWorks to build a new porch.  Design requests included a slightly larger deck, a bench to sit on and set items on when entering, and preferably no handrails.

Demolition day.  Old deteriorated aluminum flashing under threshold.

Rotten rim joist.



Old porch gone.  A clean slate.  Part of the project was to remove old siding and replace with Hardisiding.

Soft soil. Showing forms for two new footings.

Exposed mud sill.  Ready for new flashing before install of new deck sill/plate.

New deck sill through bolted to mud sill.  Drop girder in place for cantilevered deck joists. 


Decking being installed.  Note: a design solution was to drop the overall height of the deck to meet code restrictions for a deck with out handrails.

Stair stringers and treads installed.

Beginning of bench.




Stair detail.






Handrail fabricated and installed.  The footing the stairs are resting on is the height of the new grade.  Finishing touches will require bringing in a 1/2 yard of dirt and mulch.

Pre-grading but porch mostly complete.