| Your standard pink bathroom and need of TLC. |
![]() |
| Old fiberglass tub and tub surround. |
![]() |
| Taking out the tub. |
![]() |
| Tub is removed. |
![]() |
| Corner where wall and subfloor meet damaged by water from bathtub/shower. |
![]() |
| Old tub mixer. |
![]() |
| Removing water rotted subfloor. |
![]() |
| Additional framing at tub drain floor area before install of new 3/4 ply subfloor. |
![]() |
| On another wall. Creating a bay for eventual addition of built in shelves above ca mode. |
![]() |
| Back to tub area. New hot and cold water shutoffs added before install of new mixer. Tile board has been installed in prep for install of new tub. |
![]() |
| New tub. |
![]() |
| Rough in plumbing. |
![]() |
| Tub surround receives tile board. |
![]() |
| Tile board joints taped and mortared. |
![]() |
| Beginning of tile install. |
![]() |
| As tub surround progressed it became necessary to take up remaining subfloor. |
![]() |
| Addition of blocking to floor joist system. |
![]() |
| Fresh, solid start. Bolstered floor joist system ready for 3/4 pressure treated ply subfloor. |
![]() |
| Subfloor in. |
![]() |
| Addition of tile board over subfloor in prep for tile. |
![]() |
| Tile continues to progress in tub surround. |
![]() |
| Playing with floor tile lay out. |
![]() |
| After floor tile progress, new narrower profile vanity/sink installed. |
![]() |
| Finished project photos to be added soon! |