| Client wished for these old pocket doors to be pushed back in cavities and french doors and transom to be installed in place |
![]() |
| installed and ready for painters |
![]() |
| same client wanted built in storage bench to be fabricated and installed along this wall |
![]() |
| before photo of dining room, window to be removed, salvaged and installed in adjacent wall |
![]() |
| old dining room window opening |
![]() |
| beginning to demo for new kitchen pass through |
![]() |
| view showing where old dinning room window used to be, 2x12 header installed and wall opened for dining room to enclosed porch walk through |
![]() |
| new header allowing enlarged opening from kitchen to dinning room |
![]() |
| view of old kitchen to eclosed porch pass through |
![]() |
| view dinning room to kitchen |
![]() |
| view dinning room to enclosed porch |
![]() |
| lonely dining room window to be uninstalled header installed making room made for its and other salvaged window's re-installation side by side, centered on that wall |
![]() |
| discovered termite damaged sill band between slab of enclosed porch and kitchen pass through wall, needs to come out and be replaced |
![]() |
| closer look at sill band |
![]() |
| in order to get at sill band repair had to temporarily de-instal sink base cabinet |
![]() |
| view of brick pier and curtain foundation that termite damaged sill band is sitting atop |
![]() |
| offending member. extracted lap jointed sill band or what remains of it |
![]() |
| cleaned area where new sill band will be installed |
![]() |
| pictures of new pressure treated sill band to be shown on subsequent Phase I blog post |
![]() |
| more offending termite damage found. this time the middle floor joist pictured here. the girder it is attached to is also shot through with termite damage |
![]() |
| middle joist is just powder |
![]() |
| good news though is permitted framing scope passed inspection today |
![]() |
| passed framing inspection |
![]() |
| more progress on Phase I project to come |
![]() |
| arriving on the scene. kitchen as it was |
![]() |
| before |
![]() |
| before |
![]() |
| demolition commences |
![]() |
| cupboards uninstalled, old electric cook top coming out |
![]() |
| old cabinets and cupboards awaiting movement to Durham Re-use Center |
![]() |
| clean slate |
![]() |
| hardi backer tile board installed over sub floor in preparation for base cabinets install and then tiling |
![]() |
| new cabinets and cupboards being installed. (fabricated and installed by ALCO Custom Cabinets 919. 779. 3005) |
![]() |
| new island |
![]() |
| new cook top vent in process of being installed |
![]() |
| new oven and counter tops |
![]() |
| tiling begins |
![]() |
| tiling continues |
![]() |
| half grouted |
![]() |
| fully grouted, there is a new gas cook top under the sheet |
![]() |
| punch list developing including choice of back splash tile, but a functioning kitchen at this point |