| before |
![]() |
| before |
![]() |
| before |
![]() |
| before |
![]() |
| before |
proposed drawing
proposed drawing
proposed drawing
![]() |
| after hole was cut for new sliding glass door, found the mud sill below old door was termite riddled |
![]() |
| had to take up deck boards to gain access to damaged sill |
![]() |
| old cement slab stoop landing that deck was built over needed to be removed |
![]() |
| exposed sill |
![]() |
| cutting out the damaged sill |
![]() |
| showing extensive damage |
![]() |
| more demo |
![]() |
| continued demo |
![]() |
| once the damaged sill was cut out the floor joists, still in good shape, were exposed |
![]() |
| temporary support in preparation for installation of new double 2x10 pressure treated sill |
![]() |
| first 2x10 in place |
![]() |
| 2nd 2x10 in place |
![]() |
| addition of deck plate and sistered deck joists |
![]() |
| re-assembling deck |
![]() |
| new sliding glass door in place |
![]() |
| view of new door from dining room |
![]() |
| view of door from deck |
![]() |
| installed door ready for exterior trim |
![]() |
| next stage in project. creation of pass through between kitchen and dining room |