Your standard pink bathroom and need of TLC. |
Old fiberglass tub and tub surround. |
Taking out the tub. |
Tub is removed. |
Corner where wall and subfloor meet damaged by water from bathtub/shower. |
Old tub mixer. |
Removing water rotted subfloor. |
Additional framing at tub drain floor area before install of new 3/4 ply subfloor. |
On another wall. Creating a bay for eventual addition of built in shelves above ca mode. |
Back to tub area. New hot and cold water shutoffs added before install of new mixer. Tile board has been installed in prep for install of new tub. |
New tub. |
Rough in plumbing. |
Tub surround receives tile board. |
Tile board joints taped and mortared. |
Beginning of tile install. |
As tub surround progressed it became necessary to take up remaining subfloor. |
Addition of blocking to floor joist system. |
Fresh, solid start. Bolstered floor joist system ready for 3/4 pressure treated ply subfloor. |
Subfloor in. |
Addition of tile board over subfloor in prep for tile. |
Tile continues to progress in tub surround. |
Playing with floor tile lay out. |
After floor tile progress, new narrower profile vanity/sink installed. |
Finished project photos to be added soon! |