As was. Tile board surround. Not plumbed for a shower, double hung sash in the middle of it all. |
Out it comes. |
Reframing with new header. |
framing done. installation of insulation. |
exterior process picture |
step back showing framing prior to insulation |
Sizing for glass block |
Drywall prior to tile board for extra R factor |
Glass block and dry wall installed |
Up goes tile board |
and tile |
while all this has been going on the shower line was roughed in. more tiling. |
No comments:
Post a Comment