As was. Tile board surround. Not plumbed for a shower, double hung sash in the middle of it all. |
![]() |
Out it comes. |
![]() |
Reframing with new header. |
![]() |
framing done. installation of insulation. |
![]() |
exterior process picture |
![]() |
step back showing framing prior to insulation |
![]() |
Sizing for glass block |
![]() |
Drywall prior to tile board for extra R factor |
![]() |
Glass block and dry wall installed |
![]() |
Up goes tile board |
![]() |
and tile |
![]() |
while all this has been going on the shower line was roughed in. more tiling. |