before photo of dining room, window to be removed, salvaged and installed in adjacent wall

old dining room window opening


beginning to demo for new kitchen pass through

view showing where old dinning room window used to be, 2x12 header installed and wall opened for dining room to enclosed porch walk through

new header allowing enlarged opening from kitchen to dinning room

view of old kitchen to eclosed porch pass through

view dinning room to kitchen

view dinning room to enclosed porch

lonely dining room window to be uninstalled header installed making room made for its and other salvaged window's re-installation side by side, centered on that wall

discovered termite damaged sill band between slab of enclosed porch and kitchen pass through wall, needs to come out and be replaced

closer look at sill band

in order to get at sill band repair had to temporarily de-instal sink base cabinet

view of brick pier and curtain foundation that termite damaged sill band is sitting atop




offending member. extracted lap jointed sill band or what remains of it

cleaned area where new sill band will be installed

pictures of new pressure treated sill band to be shown on subsequent Phase I  blog post

more offending termite damage found.  this time the middle floor joist pictured here.  the girder it is attached to is also shot through with termite damage

middle joist is just powder

good news though is permitted framing scope passed inspection today

passed framing inspection

more progress on Phase I project to come