Tuesday, July 31, 2012

Other Summer Project

Client wished for these old pocket doors to be pushed back in cavities and french doors and transom to be installed in place





installed and ready for painters

same client wanted built in storage bench to be fabricated and installed along this wall








Thursday, July 26, 2012

Phase I: Existing House Renovations

before photo of dining room, window to be removed, salvaged and installed in adjacent wall

old dining room window opening


beginning to demo for new kitchen pass through

view showing where old dinning room window used to be, 2x12 header installed and wall opened for dining room to enclosed porch walk through

new header allowing enlarged opening from kitchen to dinning room

view of old kitchen to eclosed porch pass through

view dinning room to kitchen

view dinning room to enclosed porch

lonely dining room window to be uninstalled header installed making room made for its and other salvaged window's re-installation side by side, centered on that wall

discovered termite damaged sill band between slab of enclosed porch and kitchen pass through wall, needs to come out and be replaced

closer look at sill band

in order to get at sill band repair had to temporarily de-instal sink base cabinet

view of brick pier and curtain foundation that termite damaged sill band is sitting atop




offending member. extracted lap jointed sill band or what remains of it

cleaned area where new sill band will be installed

pictures of new pressure treated sill band to be shown on subsequent Phase I  blog post

more offending termite damage found.  this time the middle floor joist pictured here.  the girder it is attached to is also shot through with termite damage

middle joist is just powder

good news though is permitted framing scope passed inspection today

passed framing inspection

more progress on Phase I project to come

Kitchen II

arriving on the scene. kitchen as it was

before

before

demolition commences

cupboards uninstalled, old electric cook top coming out

old cabinets and cupboards awaiting movement to Durham Re-use Center

clean slate



hardi backer tile board installed over sub floor in preparation for base cabinets install and then tiling

new cabinets and cupboards being installed.  (fabricated and installed by ALCO Custom Cabinets 919. 779. 3005)

new island


new cook top vent in process of being installed


new oven and counter tops



tiling begins

tiling continues

half grouted


fully grouted,  there is a new gas cook top under the sheet


punch list developing including choice of back splash tile, but a functioning kitchen at this point