Thursday, July 26, 2012

Kitchen II

arriving on the scene. kitchen as it was

before

before

demolition commences

cupboards uninstalled, old electric cook top coming out

old cabinets and cupboards awaiting movement to Durham Re-use Center

clean slate



hardi backer tile board installed over sub floor in preparation for base cabinets install and then tiling

new cabinets and cupboards being installed.  (fabricated and installed by ALCO Custom Cabinets 919. 779. 3005)

new island


new cook top vent in process of being installed


new oven and counter tops



tiling begins

tiling continues

half grouted


fully grouted,  there is a new gas cook top under the sheet


punch list developing including choice of back splash tile, but a functioning kitchen at this point

Tuesday, April 10, 2012

4/10/12 NJ

this morning started out looking like this

ended up looking like this

handrails back up, posts almost finished save for trim detail, in primed and puttied state

As of 4/9/12 on NJ project

both front and side sided and primed with top cap on front side

stair rail posts taking shape

Sunday, April 8, 2012

Summit , NJ Porch Planter Progress 4/7/12

right front side sided and primed

left front side sided and primed

Thursday, April 5, 2012

Summit, NJ porch box planter fix

looks nice enough

rot is lurking

little bit visible in post



The planter was all riddled with rot and inadequate framing.  This post demo shot shows addition of new four by four posts set in concrete post holes

this image should be before last image.  post demo before digging new post holes

demo process

demo process


close to end of first day

Wednesday, March 28, 2012

Banner Street Kitchen Project Update

Counter tops installed!

Sun shinning on new counter tops

another new counter top view

Add caption

Counter top as seen through dining room pass through