Sunday, April 8, 2012

Summit , NJ Porch Planter Progress 4/7/12

right front side sided and primed

left front side sided and primed

Thursday, April 5, 2012

Summit, NJ porch box planter fix

looks nice enough

rot is lurking

little bit visible in post



The planter was all riddled with rot and inadequate framing.  This post demo shot shows addition of new four by four posts set in concrete post holes

this image should be before last image.  post demo before digging new post holes

demo process

demo process


close to end of first day

Wednesday, March 28, 2012

Banner Street Kitchen Project Update

Counter tops installed!

Sun shinning on new counter tops

another new counter top view

Add caption

Counter top as seen through dining room pass through

Tuesday, March 13, 2012

Banner street Today 3/13/12

Cabinet doors off for priming and painting, stove installed, waiting on counter tops

Fridge in its nook

seen from dining room into kitchen

all painting being expertly done by client, electric trim out today

up close with drywall transom detail

Saturday, March 3, 2012

3/03/12 Banner Street Kitchen Progress

showing great new to be wall color

drawers and drawer faces fabricated and installed

fabricated and installed doors

more fabricated and installed doors

Monday, February 27, 2012

Mon. 2/27/12 Banner Street Progress

venting microwave installed, duct work to come

dry walled doorway and transom almost complete

over refrigerator nook cupboard waiting for doors

sink side cupboards waiting for doors

Saturday, February 25, 2012

Progress on Banner Street Kitchen Project

first square foot of flooring in place

full line down

almost there, after all the flooring was installed it was covered with cardboard to protect while rest of work continues

interior of cabinets showing a smart new coat of paint